Quality Assurance Quality Assurance Check Sheet Check completed by:* Daniel Moors Karl Drinkhill Lee Turner Martin Underhay Michael Rowe Peter Armstrong Piotr Zawalny Tony Woods Main Contractor:Site:Plot Number:After Insulating: Check the DPM under the floor insulation. Check the perimeter strip in place where required. Check the 500g DPM has been fitted on top of the floor insulation, if required. (This may not be needed if eggshell type underfloor heating grids are being used). Check the floor insulation is fitted well. Check the wall insulation for timber frame buildings and check the vapour barrier is in place. Check ceiling insulation, this may not be installed until later on in the project. Organise any materials to be removed from site. Check for cleanliness Any comments:Date of Check DD slash MM slash YYYY Photos: Insulation Drop files here or Select files Max. file size: 2 MB. After Screeding: Check for flatness. Organise for any materials to be removed from site or grit to be spread around. Check for cleanliness. Any comments:Date of Check DD slash MM slash YYYY Photos: Screeding Drop files here or Select files Max. file size: 2 MB. After Metal Studwork: DPC fitted to floor track and head track if necessary. Floor and head track to be fitted with correct size nails and correct distance apart. Studs to be crimped or screwed throughout with door frames screwed only. Door timbers screwed in securely. Stud to be fitted to enable a plasterboard to sail behind where necessary. Deflection detail to be fitted to site specific rules. Fire rips to be fitted tightly and fire mastic used on any joins. Remove excess materials from site unless they may be required, in which case store appropriately. Check for cleanliness. Any comments:Date of Check DD slash MM slash YYYY Photos: Metal Studwork Drop files here or Select files Max. file size: 2 MB. After MF ceilings: Check hangers for amount and quality. Check that isoedge has been installed, if required. Check that all MF5 has been screwed in place and not clipped. Remove excess materials from site unless they may be required for patching in which case store appropriately. Check for cleanliness. Any comments:Date of Check DD slash MM slash YYYY Photos: MF Ceilings Drop files here or Select files Max. file size: 2 MB. After tacking and drylining: Check general quality of work, for example are all screws flush, are there any unacceptable gaps and are any boards unsecured. Check that reveals are even, plumb and square. Check that enough drywall adhesive is being used and it is continuous around the edges of the boards and all sockets. Arrange for any boards or fixings to be removed from site. Check socket holes are cut accurately. Check for cleanliness. Any comments:Date of Check DD slash MM slash YYYY Photos: Tacking & Drylining Drop files here or Select files Max. file size: 2 MB. After plastering: Check splay lines are straight. Check general finish with attention to internal corners. Check that the door linings have been left free from excess plaster. Check the floors have been scraped and all areas thoroughly cleaned up. Arrange removal of any surplus materials from site. Check that sockets have been cleaned out. Check for cleanliness. Any comments:Date of Check DD slash MM slash YYYY Photos: Plastering Drop files here or Select files Max. file size: 2 MB. Site completion: Check all contract work is complete and double check by looking through the labour rates sheets in the Dropbox. Clear site of materials and check the trades have left it clean and tidy. Off hire skips and any other hire equipment. Remove the completed Site Induction and Toolbox Talks register to return to the office. Finalise and sign up any extras. Notify the office so the final account can be arranged. Any comments:Date of Check DD slash MM slash YYYY Photos: Site Completion Drop files here or Select files Max. file size: 2 MB.